Meastro Architecture

Interior Design · Commercial · Workplace · Rochester

Ironworks Studio

An adaptive reuse where the cheapest possible intervention, cleaning and glazing, turned out to be the right one.

Projects/Ironworks Studio

Discipline
Interior Design
Sector
Commercial
Type
Workplace
Location
Rochester
Year
2023
Status
Built
Area
1,450 m²
Client
Ironworks Collective

The project

The foundry had a steel frame in better condition than the survey suggested and a roof that was beyond saving. We replaced the roof, glazed the north slope, cleaned everything else, and stopped.

The desks sit on a raised deck that floats clear of the original floor, because the original floor is oil-soaked and could not be made good within the budget. Leaving it visible under the deck was a decision the collective made, not us, and it is better than what we proposed.

The making floor stays as it was: full height, full width, no partitions, one crane rail.

Before and after

What was here, and what is here now.

Ironworks Studio after completion
Ironworks Studio before works
BeforeAfter
BeforeThe disused foundry under scaffolding, with the project team surveying the retained shed from the yard.AfterThe finished shed from the same corner of the yard, north slope reglazed.

Parts of the interior

Ironworks Studio, North glazing

North glazing

The one slope worth opening up.

Ironworks Studio, Crane rail

Crane rail

Kept, and still used.

Ironworks Studio, Retained frame

Retained frame

Better than the survey suggested.

Ironworks Studio, Floating deck

Floating deck

Desks above an oil-soaked floor left on show.

Something like this, on your site?

Start a conversation